Posts

Cooling Tower Maintenance in Freezing Weather

As winter approaches, it seems prudent to cover some of the basics of cooling tower cold weather and freezing weather operations. This is especially important with counterflow towers because special procedures are required to minimize ice formation within a counterflow cooling tower when it is operated at or below freezing temperatures.  Otherwise, ice forms on the fill and drift eliminators.  A sufficiently heavy build up will cause damage to the fill, drift eliminators, or structural members.

The Basics

The most important factor is to learn to identify your own individual needs with respect to winter operation control.  There is simply no substitute for frequent visual inspections of the tower until enough operating experience has been gained to verify that a specific operating mode is effective for a given set of load and ambient conditions.

The key to successful winter start up is to preheat the water in the basin before it is directed up and over the tower.  A heat load must be applied to the tower with the hot return water bypassed directly back to the basin.  Water may then be routed up over the tower when the basin water temperature reaches approximately 80°F.  Fan speed and number of fans operating may then be used to regulate the basin water temperature.  As an added step in maintaining heat in the basin, all fans may be deactivated.

Without fans operating, air flow through the tower will continue by the thermal draft at flow rates up to one fourth that of operating the fans on low speed.  This may prove to be an alternative to cold weather operation under colder conditions.

Ice

Icing on the columns and lateral supports should not be broken off manually as damage to the structure may occur.  To remove icing on support structure, should it develop, the tower may be operated without fans in operation until the hot water melts the ice and clears the supports.

It is important to note that the bypass valve must not be left open at the same time that one or both riser valves are open. 

Under severe cold weather conditions, (below zero degrees F) the normal procedure is to operate each individual fan in reverse for a period of fifteen (15) to twenty (20) minutes and to repeat this cycle once every two (2) to three (3) hours.

A simple automatic deicing control system would be as follows: One switch would start the automatic deicing system which would sequence each fan or group of fans in reverse operation. The automatic system should have an adequate time delay between forward and reverse fan operation keeping in mind that the fan must come to a complete stop. In addition, this would allow the control room operator to deice each cell independently for an extended period of time if visual inspection showed that a localized icing problem existed after the automatic deicing cycle. Fans should not be operated in reverse for extended periods since ice can form on fan blades, fan stacks, or drift eliminators and may cause damage. For this reason, the maximum recommended time interval for fan reverse operation is thirty minutes per reverse operation cycle.

Your operators will gain experience with the tower at varying weather conditions. Midwest Cooling Towers highly recommends that your operators maintain a log detailing cooling tower configuration (number of pumps operating, number of fans operating, individual fan speeds, and weather conditions).

Connect with Midwest Towers